In Kiel, a total of nine shipbuilding halls of different sizes and an office building are to be built on the site of thyssenkrupp Marine Systems GmbH. For this and for the construction of a large traffic area, it is necessary to demolish the existing buildings. A total of eight existing buildings and one above-ground tank are to be demolished on an area of around 25,000 m². Furthermore, the foundations of the former crane installations in the north and east, which have already been dismantled, as well as the surface reinforcement, must be demolished.
For the foundation of the halls, which cover an area of 10,000 m² and have a minimum height of 25 m for the crane hook height, the operating building and the traffic areas, subsoil investigations as well as orientating environmental investigations of the land areas to be built on were necessary.
Client: thyssenkrupp Marine Systems GmbH
Total project duration: 2016 to vsl. 2021
Total project costs: approx. €
56.0 millionArea size: approx. 2.5 ha
BIG’s share of services:
- Subsoil investigation including detailed planning of the exploration program, technical support of the exploration work and execution of soil mechanics laboratory tests
- Geotechnical report according to DIN 4020 (A7) including indication of the characteristic soil characteristics and foundation recommendation including environmental assessment
- Environmental investigation (orientation investigation) including preparation of an investigation concept, technical supervision of the field work and coordination with the environmental authority
- Examination of the building fabric for use-related building pollutants including the creation of a building pollutant register and dismantling concept
- Investigation report with evaluation and evaluation of the orientation investigation including risk assessment
- Planning, tendering and supervision of demolition work as well as coordination in accordance with TRGS 524 / DGUV-R 101-004 for work in contaminated areas taking into account TRGS 519